Erith Timeline : 2012

Traws

Trawsfynydd Power Station

Erith were awarded the bulk asbestos removal package to the obtuse bends at the former Trawsfynydd Power Station.

Milestone

Erith reach 1,000,000 working hours without a single reportable lost time incident.

World-Demo

Awards

• Industrial Demolition Award
• Contractor of the Year
• Collaboration Award
• Construction News Specialist:

Training & Development Award

Crossrail

Erith awarded Crossrail C300 Term Contract for tunnel arisings disposal.

AB

Kingsgate House

Kingsgate House: Top down demolition of a 10 Storey, reinforced concrete building in Victoria Street, London

Erith-20130125-horseferry-4992

Horseferry Road

Substructure works including basement construction and significant temporary works, following the successful superstructure demolition.

Charity

Erith support The Prince’s Trust Charity