Transport

Erith-HamptonHouse-20140305-WEB-9241

Rail

Historically, asbestos was widely distributed throughout rail networks – predominantly in stations, signal boxes, depots and outbuildings. It was also used to insulate signalling and other electrical equipment beside the railway line.
The continuity of transport is of fundamental importance, requiring Erith to remain adaptable to work at the most unsociable hours. Work within this sector often requires the ability to operate within confined spaces and out of peak hours; Erith’s 24 hour waste transfer station allows the ability to work throughout the night.


Blackfriars Station Olympic Bridges

Erith-20121214-vicext-WEB-3574

Station Redevelopment

Erith have been part of many high profile station redevelopment schemes – notably Victoria Station Upgrade and Blackfriars Station Redevelopment. Through early contractual engagement, we drive customer value and innovation whilst delivering time, cost and safety benefits.


Blackfriars Station Olympic Bridges
Erith-HamptonHouse-20140305-WEB-9199

Adjacent Railways/Highways

As a Section 278 Contractor, Erith’s Earthworks Division have a recognisable portfolio working on highways. Projects have incorporated drainage installation, road widening schemes, adoptable highways and hard and soft landscaping.

With a formidable presence within the heart of the capital, Erith have implemented innovative solutions when confronted with neighbouring network lines. Early contractual engagement, protective perimeters and extensive environmental monitoring are all implemented to help mitigate any disruptions to active transport networks.


Blackfriars Station Olympic Bridges Nine Elms